power power plants tenders in chhattisgarh
chhattisgarh , surajpur
- South Eastern Coalfields Limited
- maintenance and strengthening of ht overhead line feeder no.1 and 2 from main surface substation 33kv/3.3kv of kalyani ug mine to 3.3kv/550v/440v substation of shiwani ug mine and other miscellaneous work of the ht overhead line.
- Deadline : 11 Jan 2021
- Updated : 07 Jan 2021
- Value : 1.83 Lac
- Download
chhattisgarh , durg
- Chhattisgarh State Power Distribution Company Limited
- estimate for est. shift. of 11kv line at tirupati pule and shift. of 11kv line at metex engig. baghera d/c.
- Deadline : 18 Jan 2021
- Updated : 08 Jan 2021
- Value : 65 Thousand
- Download
chhattisgarh , dongargarh
- Chhattisgarh State Power Distribution Company Limited
- 1 estimate for shifiting of lt line pole at wardno. 09 under dgg-t d/c (oandm) dn. dongargarh 2 estimate for shifiting of lt line /pccpole at vill bortalab under dgg-r d/c
- Deadline : 12 Jan 2021
- Updated : 08 Jan 2021
- Value : 46 Thousand
- Download
chhattisgarh , raipur
- Chhattisgarh State Power Distribution Company Limited
- 1 estimate for shifiting of 11kv line and dp at vill lb nagar under lb nagar d/c ( mr. balram das manikpuri) 2 estimate for shifiting of lt pole at vill baputola under lb nagar 3 estimate for extensión of lt line at vill chhuriya under chhuriya 4 estimate
- Deadline : 11 Jan 2021
- Updated : 08 Jan 2021
- Value : 1.94 Lac
- Download
chhattisgarh , durg
- Chhattisgarh State Power Distribution Company Limited
- estimate for maintainance of 11kv and lt line at various location and reno. of x,mer 11/.4 kv ss under arjunda dc.
- Deadline : 18 Jan 2021
- Updated : 08 Jan 2021
- Value : 2.74 Lac
- Download
chhattisgarh , korba
- South Eastern Coalfields Limited
- assistance in rectification of h.t/l.t overhead line faults in backshifts at quarry of dipka expansion project for a period of one year.
- Deadline : 03 Feb 2021
- Updated : 20 Jan 2021
- Value : 22.62 Lac
- Download
chhattisgarh , bilaspur
- National Thermal Power Corporation Limited
- oh service contract for re commissioning of shinkawa make tsi vms formain turbine and tdbfp a and b of ntpc sipat u4(500 mw).
- Deadline : 23 Jan 2021
- Updated : 21 Jan 2021
- Value : Refer Document
- Download
chhattisgarh , raipur
- Directorate Of Technical Education
- supply of 3ø transmission line system with fault analysis using iot-.
- Deadline : 15 Feb 2021
- Updated : 29 Jan 2021
- Value : Refer Document
- Download
chhattisgarh , raipur
- Chhattisgarh State Power Transmission Company Limited
- construction of 132 kv dcds line from 2201132 kv s/s patan to proposed i32133kv khamhariya (amleshwar), tehsil- patan, dist. durg on turnkey basis (approx. 19 km. including 1`5 km. line on multi circuit towers)
- Deadline : 09 Feb 2021
- Updated : 04 Feb 2021
- Value : Refer Document
- Download
chhattisgarh , raipur
- Chhattisgarh State Power Distribution Company Limited
- shifting of line b`bazar dc
- Deadline : 26 Feb 2021
- Updated : 20 Feb 2021
- Value : Refer Document
- Download